Skip to main content

Route log surveyed 2 Nov 2026

Roadmap

What I've finished, what I'm working on and what comes next, for this site, box and coin-flip.

Project

Status

Showing 7 entries

Summit

Planned · 2 entries

  1. Play Store release

    coin-flip

    Releasing the app through the Play Store.

  2. v1.1 Smoother toss

    coin-flip

    Smoothing the toss and the camera follow.

Current camp

In progress · 1 entry

  1. v2.0 Topographic Identity

    Portfolio

    This redesign: the whole site rebuilt around the real Matterhorn terrain.

    Phases 7–12
    1. Phase 7Foundation & guardrails24 Oct 2026
    2. Phase 8Data & terrain pipeline24 Oct 2026
    3. Phase 9Home ascent25 Oct 2026
    4. Phase 10Photography26 Oct 2026
    5. Phase 11Engineering & roadmap2 Nov 2026
    6. Phase 12Contact, edge pages & cleanupIn progress

Base

Completed · 4 entries

  1. v1.0 First release on device

    coin-flipCompleted 9 Aug 2026

    The first release, running on my own device: a fair draw, a 3D toss, no permissions and no network.

  2. v2.0 Toolbox → toolkit

    boxCompleted 14 Jul 2026

    The tools became scriptable: JSON output, --clip, config-file defaults, BLAKE3 hashing and previews before destructive changes.

  3. v1.0 Full toolbox

    boxCompleted 24 Jun 2026

    All 23 tools in one Rust binary, installed from PowerShell 7.

  4. v1.0 Stabilization & Visual Identity

    PortfolioCompleted 12 Mar 2026

    The first version of this site, stabilized and given its own visual identity.

Want to talk about something on this list? Get in touch.